MRTS, Russia

Production of 56" pipe welds in 2G position without backing

Root pass would be welded on STT, while the rest of runs would be completed on FCAW. The process included an initial stage of instruction for all welders involved, and the evaluation of different consumables in order to assess which of them would fit best. Once that stage had concluded, we developed due welding parameters for the Vermaat-Lincoln equipment, then proceeded to production.

MRTS, Russia

Production of pipe reinforcements

During our time in Russia last year, we took part in a highly innovative project, which consisted in the production of pipe reinforcements out of plates, by welding them in two stages with the Vermaat-Lincoln system, combining STT welding and Precision Pulse for its completion. First, two plates would be welded together in 1G position, then bent to a pipe shape. Finally, both ends of the plate would be welded again in order to obtain a complete piece, that would eventually serve as an external reinforcement for pipe segments.

MRTS, Russia

Training of Russian Welding personnel in Arkhangelsk (North Russia)

Development of procedures using Vermaat Automatic Welding system. Working in the Welding School in Arkhangelsk on the training of Russian Welding Technicians and Welders for future pipeline and fabrication projects with automatic and semi-automatic systems.

Working on the production of 56” piles and structures for Sabetta LNG port – Phase 2.
Automatic welding system: Vermaat Dual Torch
Manual: SMAW, FCAW, STT & Air Carbon Arc Gouging.

Haane, Russia

Consultancy for Haane Welding Systems in Russia

Working closely with both Client and Supplier to find the ultimate welding solution for fabrication yard of pipes using multi wire submerged arc welding, this includes pipe forming, preparation and welding, pipe handling and pipe testing for SAW multi-wire welding with inside and outside welding with an intelligent flux feeding and recovery system.

MRTS, Russia

Training of Russian Welding personnel in Arkhangelsk (North Russia)

Development of procedures using Vermaat Automatic Welding system. Working in the Welding School in Arkhangelsk on the training of Russian Welding Technicians and Welders for future pipeline and fabrication projects with automatic and semi-automatic systems.

Working on the production of 56” piles and structures for Sabetta LNG port – Phase 2.
Automatic welding system: Vermaat Dual Torch
Manual: SMAW, FCAW, STT & Air Carbon Arc Gouging.

Haane, Russia

Consultancy for Haane Welding Systems in Russia

Working closely with both Client and Supplier to find the ultimate welding solution for fabrication yard of pipes using multi wire submerged arc welding, this includes pipe forming, preparation and welding, pipe handling and pipe testing for SAW multi-wire welding with inside and outside welding with an intelligent flux feeding and recovery system.

Weldon, Russia

Russian federation

Automatic Welding Services S.L. has signed a long term contract with WELDON. This contract includes welding services, training and consulting along the Russian Federation territory.


MRTS, Russia

Novoportousky Baydaratskaya Bay (North Russia)

Development of procedures using Vermaat Automatic Welding System. Welders WPQT. Welding supervision of offshore installation of 8km x 28” pipeline onboard the PLB “MRTS DEFENDER”.

Pipe size : 28”
Pipe thickness : 18mm
Pipe grade : X 65
Applicable code : DNV + NGAS
Welding system: Vermaat Dual Torch


MRTS, Russia

Training of Russian Welding personnel in Arkhangelsk (North Russia)

Development of procedures using Vermaat Automatic Welding System. Working in the Welding School in Arkhangelsk in the training of Russian Welding Engineers, Welding Technicians and Welders for future pipeline projects with automatic and semi-automatic systems.
Working in the production of 56” piles and structures for Sabetta LNG Port.

Automatic welding system: Vermaat Dual Torch
Manual: SMAW, FCAW, STT & Air Carbon Arc Gouging

MRTS, Russia

Development of the Underwater Crossing of the Baidaratskaya Bay 3 (North Russia)

The Project included the offshore installation of 30KM X 48” pipeline onboard the PLB “MRTS DEFENDER”.

Pipe size : 48”
Pipe grade : X 70
Pipe thickness : 27 mm
Applicable code : DNV + NGAS
Welding system: CRC


MRTS, Russia

Training of Russian Welders in Arkhangelsk (North Russia)

Working in the Welding School in Arkhangelsk to train the Russian Welders for future pipeline projects with automatic and semi-automatic systems.
Automatic welding system: CRC
Manual welding: SMAW & Air Carbon Arc Gouging


GSP Offshore, Romania

Welding School in Midia (Romania)

Our Supervisors were hired to work in the Welding School to train Romanian Welders and Automatic Welding Technicians for GSP in the Vermaat automatic welding system.

Automatic Welding System: Vermaat
Manual Welding: SMAW, FCAW, GTAW & Air Carbon Arc Gouging


GSP Offshore, Romania

Galata Project (Bulgaria)

Offshore installation of 2.85km x 6” pipeline from Galata Platform to Karvana East and 1.7km x 10” pipeline from Galata Platform to Galata East 3, with associated piggyback liquid lines onboard PLB “GSP BIGFOOT 1”.

Pipe size : 6”
Pipe grade : X 52
Pipe thickness : 11 mm
Applicable code : API 1104
Welding system: Vermaat

Pipe size : 10”
Pipe grade : X 52
Pipe thickness : 15,9 mm
Applicable code : API 1104
Welding system: Vermaat


Zamakona Yards, Spain

Platform Maintenance

Supplied Welders to assist in the maintenance of Drilling Rig, “Eirik Raude”.


SERIMAX, France

Subcontractor for 2013

Working to supply Welding services to assist in many projects both Offshore and Onshore in China.

Vermaat, Netherlands

Vermaat Factory in Rockanje (Rotterdam)

To supply Automatic Welding Technician’s to assist in the construction of ten (10) Vermaat Welding Dual Torch Stations.


MRTS, Russia

Pipe Lay Barge Upgrade

Assisting in the Engineering and Procurement for the upgrade of the PLB “MRTS FORTUNA” to build a Double Joint Factory. Assisting with the design of the line-up, transfer rollers and welding stations. Involved in the project to analyse which Sub-Arc Welding System should be purchased for the upgrade of the PLB “MRTS FORTUNA”.


MRTS, Russia

Development of the Underwater Crossing of the Baidaratskaya Bay 2 (North Russia)

The Project included the offshore installation of two (2) 30km X 48” pipeline and two (2) 48” x Beach pulls. Plus two (2) tie-ins at the Baidaratskaya Bay Field onboard the PLB “MRTS DEFENDER”.

Pipe size : 48”
Pipe grade : X 70
Pipe thickness : 27 mm
Applicable code : DNV + NGAS
Welding system: CRC

Onshore Installation of two (2) 10km x 48” pipelines in Baidaratskaya Bay to join with the 48” offshore pipelines.

Pipe size : 48”
Pipe grade : X 70
Pipe thickness : 27 mm
Applicable code : DNV + NGAS
Welding system: CRC


MRTS, Russia

Welders Training in Arkhangelsk (North Russia)

Open a new Welding School in Arkhangelsk to train the Russian Welders for future pipeline projects with automatic and semi-automatic systems.

Automatic welding system: CRC
Manual welding: SMAW & Air Carbon Arc Gouging.


MRTS, Russia

Development of Kirinskiy Gas Condensate Field Phase 2 (Shakhalinsk Island)

Offshore Installation of 15km x 10” pipeline and two (2) 10” tie-ins in Kirinskiy Field onboard the PLB “MRTS FORTUNA”.

Pipe size : 10”
Pipe grade : X 60
Pipe thickness : 17.5mm
Applicable code : DNV + NGAS
Welding system: STT Lincoln & FCAW Kemppi

Offshore Installation of 10km x 4” pipeline, onboard the PLB Nebula in Kirinskiy Field.

Pipe size : 4.5”
Pipe grade : X 52
Pipe thickness : 9mm
Applicable code : DNV+NGAS
Welding system: STT Lincoln & FCAW Kemppi


MRTS, Russia

Welders Training in Slavanka (Vladivostok area)

Teaching in the Welding School for a period of four (4) months to train the Russian Welders to weld with STT and FCAW for the Kirinskiy Gas Condensate Phase 2 Project.

MRTS, Russia

Welders Training in Slavanka (Vladivostok area)

Teaching in the Welding School for a period of four (4) months to train the Russian Welders to weld with STT and FCAW for the Kirinskiy Gas Condensate Phase 2 Project.


MRTS, Russia

Development of Kirinskiy Gas Condensate Field, Phase 1 (Shakhalinsk Island)

IOffshore Installation of 15km x 10” pipeline and 10km x 4” pipeline in Kirinskiy Field plus 1.5km x 4” Beach pull onboard PLB “MRTS FORTUNA”.

Pipe size : 10”
Pipe grade : X 60
Pipe thickness : 17.5mm
Applicable code : DNV + NGAS Welding system: STT Lincoln & FCA
W Kemppi

Pipe size : 4.5”
Pipe grade : X 52
Pipe thickness : 9mm
Applicable code : DNV+NGAS
Welding system: STT Lincoln & FCAW Kemppi


GSP Offshore, Romania

GSP Bigfoot 1, Agigea Fabrication yard

Conversion of the five (5) welding stations and modification of the gas pipe, cables, power source frames and lighting onboard the PLB “GSP BIGFOOT 1” to enable a more efficient and effective welding production.


GSP Offshore, Romania

Dzuhubga-Lazarevskoye-Sochi (DLS) Project (Black Sea Russia)

Offshore installation of 159.5km gas pipeline. The pipeline route runs on the Black Sea bottom following the coastline (approximately 4.5km away from the coast) to the Kudepsta gas distribution station near Sochi. The 24” and 6” gas pipelines and the installation of five (5) shore approaches and pipeline tie-ins onboard PLB “GSP BIGFOOT 1”.

Pipe size : 6”
Pipe grade : X 42
Pipe thickness : 12mm
Applicable code : DNV
Welding system: Vermaat

Pipe size : 24”
Pipe grade : X 42
Pipe thickness : 15mm
Applicable code : DNV
Welding system: Vermaat


GSP Offshore, Romania

Welding Workshop in Constanta (Romania)

Fabrication of a Jet Air Skid for the trenching of the DLS Beach pulls.


GSP Offshore, Romania

Welding School in Constanta (Romania)

Open a new welding school for the training of Romanian Welders in the automatic and semi-automatic pipeline discipline.
Automatic welding system: Vermaat
Manual welding: SMAW, FCAW, GTAW & Air Carbon Arc Gouging/p>

GSP Offshore, Romania

The Akcacoa Project (Turkey)

Hook-up installation of a 4-leg Jacket over the two predrilled wells onboard “GSP BIGFOOT 3”.


GSP Offshore, Romania

The Akcacoa Project (Turkey)

The Akcacoa gas project pipeline installation of 7km x 12’’ and tie-ins to the existing offshore pipeline onboard PLB “GSP BIGFOOT 1”.

Pipe size : 12”
Pipe grade : X 42
Pipe thickness : 17.5mm
Applicable code : API 1104
Welding system: Vermaat


GSP Offshore, Romania

Galata Project (Bulgaria)

Offshore installation of 8.5km x 6” pipeline from Galata Platform to Wellhead Kavarna 2 and 14.5km x 10” pipeline from Galata Platform to Wellhead Kaliakra 2, with associated piggyback liquid lines onboard PLB “GSP BIGFOOT 1”.

Pipe size : 6”
Pipe grade : X 52
Pipe thickness : 11mm
Applicable code : API 1104
Welding system: Vermaat

Pipe size : 10”
Pipe grade : X 52
Pipe thickness : 15.9mm
Applicable code : API 1104
Welding system: Vermaat

 

 

Clients & Partners

Latest News

Our Mision

To provide our customers with our expertise and know how working with the latest technologies in welding in order to achieve operational excellence, high quality, safety and competitive advantages.

Our Vision

We'll become leaders in the welding industry using cutting edge technologies and always looking for improvement and innovation. 

Our Values

  • Continuous improvement of our competences
  • Commitment with our clients' objectives 
  • Commitment with Safety 

Contact